| 1 |
Building Purpose |
Residential home, holiday cabin, worker accommodation, student housing, office, classroom, or hospitality unit. |
Single-family residential house for year-round occupancy. |
The intended use affects room planning, fire safety, insulation, plumbing, ventilation, and local approvals. |
Relevant completed-project photos, floor plans, specifications, and references for the same building type. |
| 2 |
Total Floor Area |
Required gross floor area, number of floors, room count, and future expansion needs. |
120 m² gross floor area, two floors, three bedrooms, two bathrooms, and one kitchen. |
A clear area target allows suppliers to quote comparable designs instead of using different inclusions. |
Dimensioned drawings showing gross area, usable area, wall thickness, and floor-to-floor height. |
| 3 |
Site Conditions |
Site location, access width, ground condition, slope, drainage, utilities, and available installation space. |
Urban plot with a 4 m access route and limited space for on-site storage. |
Transport, crane selection, foundation design, and installation planning depend on actual site limitations. |
Site survey checklist, foundation assumptions, lifting plan, delivery route review, and installation method statement. |
| 4 |
Climate and Environmental Loads |
Climate zone, minimum and maximum temperatures, wind speed, snow load, rainfall, humidity, and seismic conditions. |
Cold winter climate with design temperatures below 0°C and moderate snow exposure. |
Structural safety, thermal comfort, moisture control, roof design, and material selection must suit the destination. |
Structural calculations, thermal-performance data, weather resistance details, and destination-code compliance documents. |
| 5 |
Structural System |
Preferred system such as light-gauge steel, structural steel, timber, concrete, or a hybrid system. |
Factory-assembled steel-framed modules with corrosion protection suitable for the local environment. |
The structural system influences durability, transport weight, assembly speed, repairability, and engineering approvals. |
Material grades, section sizes, coating system, connection details, load calculations, and inspection records. |
| 6 |
Energy and Insulation Goals |
Target energy standard, insulation material, window performance, airtightness, heating, cooling, and ventilation requirements. |
Low-energy operation with insulated walls and roof, double-glazed windows, and balanced ventilation where required. |
Energy performance depends on the complete building envelope, not insulation thickness alone. |
U-values, window specifications, condensation-control details, airtightness approach, and energy calculations. |
| 7 |
Interior and Exterior Finish |
Flooring, wall finishes, sanitary ware, kitchen level, doors, windows, façade materials, and color requirements. |
Mid-range residential finish with washable interior surfaces, durable flooring, and low-maintenance exterior cladding. |
A written finish schedule prevents substitutions and unclear differences between basic and upgraded quotations. |
Room-by-room finish schedule, product specifications, sample boards, color references, and change-order pricing. |
| 8 |
Compliance and Approvals |
Applicable building, fire, electrical, plumbing, accessibility, and energy regulations in the destination country. |
Supplier provides documents that can be reviewed by the local architect, engineer, or approval authority. |
A product manufactured for one market is not automatically approved for another market. |
Signed drawings, calculations, material certificates, fire-rating information, and a responsibility matrix for approvals. |
| 9 |
Budget and Cost Scope |
Target budget, currency, quotation basis, taxes, freight, insurance, foundation, utilities, assembly, and local works. |
Separate pricing for the factory package, international delivery, site works, installation, and local professional services. |
The lowest factory price may exclude foundations, permits, inland transport, equipment rental, or final connections. |
Itemized quotation, inclusions and exclusions, payment milestones, validity period, and allowance for site variations. |
| 10 |
Schedule and Delivery |
Required completion date, design period, production lead time, shipping time, customs clearance, and site installation duration. |
Phased delivery with an approved design freeze before production and a coordinated site-installation schedule. |
Modular construction can reduce site work, but approvals, shipping, weather, and foundations still affect completion. |
Detailed project schedule, production capacity, packaging plan, shipment milestones, and delay-management process. |
| 11 |
Quality Control |
Inspection stages for incoming materials, welding or fastening, dimensional accuracy, waterproofing, electrical work, and final packing. |
Documented inspections before shipment, with corrective actions recorded for non-conforming work. |
Factory quality control reduces defects that are expensive to identify or repair after international delivery. |
Inspection and test plan, production photos, independent inspection option, test reports, and defect-resolution procedure. |
| 12 |
After-Sales Support |
Warranty period, spare parts, technical support, maintenance instructions, remote assistance, and local service responsibilities. |
Written warranty terms with defined response times and a spare-parts process for high-use components. |
Clear support arrangements are important when the supplier and project site are in different countries. |
Warranty document, escalation contacts, maintenance manuals, spare-parts list, and responsibilities after handover. |
| 13 |
Supplier Selection Score |
Compare technical compliance, quotation completeness, quality controls, delivery capability, communication, and support. |
Technical compliance 30%, quality 20%, cost transparency 20%, schedule 15%, communication 10%, after-sales support 5%. |
A weighted score helps prevent a low initial price from outweighing major technical or delivery risks. |
Completed comparison sheet, clarification log, approved technical offer, and signed scope-of-work document. |